ANALISIS PERENCANAAN KAPASITAS PRODUKSI MENGGUNAKAN METODE ROUGH CUT CAPACITY PLANNING DI CV FAMILY BAKERY
Abstract
Keywords
Full Text:
PDFReferences
Y. Setiabudi, V. M, Afma, and H. Irwan, "Perencanaan Kapasitas Produksi ATV 12 Dengan Menggunakan Metode Rough Cut Capacity Planning Untuk Mengetahui Titik Optimasi Produksi," Profisiensi, vol. 6, no. 2, pp. 80-87, 2018.
M. Zakaria, Syukriah, and R.A. Selvia "Analisis Kebutuhan Kapasitas Produksi Dengan Menggunakan Metode Rough Cut Capacity Planning Di PT Wijaya Karya Beton," Industrial Engineering, vol. 10, no. 1, 2021.
A. Matsyawa,et al, "Analisis Perencanaan Kapasitas Produksi dengan Metode Rough Cut Capacity Planning (RCCP) Pada Pembuatan Produk Kasur Busa," vol. 26, no. 2, pp. 128-142, 2019.
F.R. Bandio at al.,, "Analisis Kapasitas Produksi Menggunakan Metode Rough Cut Capacity Planning," Vorteks, vol. 2, no. 1, pp. 221-228, 2022.
O. C. Situmorang et al., "Optimalisasi Perencanaan Kapasitas Produksi Dengan Theory Constraints dan Rough Cut Capacity Planning Methods," Barometer, vol. 8, no. 2, pp. 19-28, 2023.
N. H. Mutmainah, "Perencanaan Kapasitas Percetakan Ethica Group Menggunakan Metode Rough Cut Capacity Planning," Rekavasi, vol. 10, no. 1, pp. 1-8, 2022.
N. Meirizha and Ardiansyah,, "Analisis Kelayakan Kapasitas Produksi dengan Metode RCCP," vol. 5, no. 1, pp. 49-54, 2017.
R. H. Suwarso, Salmia and T. Priyasmanu, "Perencanaan Kapasitas Produksi Menggunakan Metode Rough Cut Capacity Planning (RCCP) Pada Home Industri Loca Nusa," Veltech, vol. 4, no. 1, pp. 21-28, 2021.
R. B. Fathur, et al., "Analisis Kapasitas Produksi Menguunakan Metode Rough Cut Capacity Planning (RCCP)," Vorteks, vol. 3, no. 2, pp. 221-228, 2022.
V. M Afma, E. Sumaryo and A. Sutrisman, "Analisis Kapasitas Produksi Pada Lini Produksi Baru Ford P702 HVPO Dengan Pendekatan Metode Rough Cut Capacity Planning," Profisiensi, vol. 9, no. 2, pp. 237-251, 2021.
DOI: https://doi.org/10.53912/iej.v12i1.1100
Refbacks
- There are currently no refbacks.
Editorial Office:
Department of Industrial Engineering, Faculty of Engineering, Universitas Malikussaleh
Kampus Bukit Indah, Lhokseumawe, Aceh - Indonesia
P.O. Box 141
Telp. +62645.41373 Fax. +62645.44450
Handphone: +628116707171
Email: iej@unimal.ac.id
This journal is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.